A Success Story in Crushing and Screening Optimization
A Success Story in Crushing and Screening Optimization
Omsakthi Mines and Minerals, a leading supplier of aggregates based in Tamil Nadu, faced persistent challenges in maintaining consistent production, quality, and plant efficiency. In 2020, after 5,500 hours of plant operation. Propel stepped in , conducting a detailed health audit to diagnose issues of their plant facing multiple operational hurdles, affecting both output and profitability, and implement corrective strategies under our Operations Maintenance Contract (OMC).
Key Challenges
- High downtime and unexpected breakdowns.
- Shortage of skilled manpower for plant operations and maintenance.
- Difficulties in spare parts inventory management and timely replacements.
- Disruptions in production planning and quality control.
- Inability to achieve desired output and product quality.
- Inefficient utilization of plant capacity.
- Inconsistent fund flow caused by sudden breakdowns and spare costs.
Propel’s Solutions
We conducted a detailed health audit and implemented a suite of solutions tailored to Omsakthi’s needs:
- 24x7 Support & Reliability: Continuous OMC support eliminated inventory concerns and ensured rapid response to issues with stipulated time.
- Boosted Efficiency : Proactive OMC services enhanced plant performance and process 2X reliability.
- High Plant Availability : Real-time monitoring helped to maintain the plant between 85-90% *.
- Maximized ROI : Optimized equipment usage led to better returns and increased durability
- Reduced Downtime : Onsite maintenance prevented production interruptions.
- Cost Savings : Streamlined parts usage lowered operational expenses.
- Extended Equipment Life: Regular preventive maintenance increased the longevity of critical assets.
- Performance Guarantees : Monthly Performance Guarantee (PG) tests ensured consistent on-plant performance and end products quality.

Results Delivered
The partnership yielded measurable improvements:
- Uptime increased by 10–15%*, consistently reaching 85–90%* plant productivity.
- Significant reduction in idle time through better planning and preventive care.
- No increase in fuel or power consumption despite higher operational output.
- Improved throughput and product quality, often exceeding process targets.
- Enhanced customer satisfaction, leading Omsakthi to install two additional plants under Propel’s OMC contracts.
Customer Testimonial

-Omsakthi mines and minerals